Process Units Pipe racks – Phase 19

      • Definition
  • Supply, Fabrication and Installation Steel Structure South Pars Gas Field Development Project – Phase19
  • Client
  • Supply of steel structure Project contract has been signed between petro pars Iran (PPI) and OILMICO.
  • General data
  • The contract affected 04 May 2011
  • OILMICO scope for supply of goods and services shall consist of works, services, duties, obligation, including but not limited to performance of required design, supply of material, fabrication, provision of drawings and data, inspections and tests, painting, packing, preparation for shipment and transportation, installation and erection at site and submitting the final document.
  • Despite of OILMICO have been developed IMS dated Nov 2013, OILMICO is so glad to announce that "OILMICO don't have been observed any Incident during the project running.
    • Duration
  • 10 Months

 

Contact Us 

Head Office:No. 94 _ Bidjan Alley _ Mohtasham Kashani St. _Esfahan _ IRAN Postal Code: 8175969747
E-mail: info@oilmico.ir
Tel: +98 (31) 3625 9191-3
Fax: +98 (31) 3625 9181

Copyright 2018 - OILMICO Oil Industrial Leading and Manufacturing International Company.

Search