• Welcome to the Oil Industrial Leading and Manufacturing International Company (OILMICO)

Wellhead Facilities – Dalan Area Nr.1

  • Wellhead Facilities – Dalan Area Nr.1
    • Definition
  • The Main Equipment:
  • PIPING SIZE ½” – 20” X52 SEAMLESS (2000 Meters)
  • PIPE LINE SIZE 8” API 5L X52 SEAMLESS for 3500 Meters
  • MANUAL AND AUTOMATIC VALVES SIZE 1”- 16” TYPE 6A & 6D
  • FITTING – FLANGE – GASKET – STUD BOLTS
  • CHEMICAL INJECTION PACKAGE
  • WELLHEAD COTROL PANEL
    • Client
    • ICOFC
    • General data
    • Location: South of Fars Province, Aghar- Dalan region, near to Farrash band Gas refinery.
    • Project Start: 10 Jul 2014
    • Project Type: PC
    • Duration
    • 18 Month

 

Contact Us 

Head Office:No. 94 _ Bidjan Alley _ Mohtasham Kashani St. _Esfahan _ IRAN Postal Code: 8175969747
E-mail: info@oilmico.ir
Tel: +98 (31) 3625 9191-3
Fax: +98 (31) 3625 9181

Copyright 2018 - OILMICO Oil Industrial Leading and Manufacturing International Company.

Search